Ely Shoshone Tribe
The Broadband Infrastructure Deployment project proposes to install a 96-strand fiber network to include service drops, strand and lash aerial fiber, and FTTH, directly connecting 118 unserved Native American households, the Tribal Library, and the Tribal Healthcare Clinic with between 50 Mbps and 1 Gbps symmetrical service.
Nevada
Funding Total
Type of Project